Skip to content

References

References by name.

From the contract coater in Nunningen to Zurich Airport: what we built and how it runs today, in films and photos from the sites. Every reference with its status.

Customers and projects (selection)

  • Passt Coating AG
  • Sievers Lackierungen
  • BETEC Beschichtungstechnik
  • BORBET
  • Camouflage Automotive Supplier to Porsche
  • Schneider Electric
  • Krone Group Ordered
  • CERN
  • United Nations Geneva
  • Zurich Airport Ordered

Most customers we describe by industry and place. Their projects are in the case library, anonymously.

Passt Coating AG, NunningenContract powder coater

Full capacity within four months

Running since 2022

The task
The company could no longer find powder coaters and was close to shutting down.
Result
After four months the line was running at full capacity again. Since then the company has been our demonstration plant in Switzerland: prospects coat their own parts there before they decide, and the managing director answers their questions himself.
Built with
  • Two self-learning Lesta MV A6 painting robots
  • Rotary encoder on the conveyor’s chain wheel
  • Upgraded control cabinet
  • The customer’s existing powder line

4 months to full capacity Source: Robonnement, Passt Coating AG project, commissioning 2022

«Ich danke meinen zwei Roboterkollegen, weil sie das tun, was ich von ihnen möchte, und mir so mehr Energie für das lassen, was ich gerne mache.»

Translation: “I thank my two robot colleagues, because they do what I want them to do and leave me more energy for what I like to do.”

Regis, coater, Passt Coating AG Customer film Passt Coating AG Original quote in German

Full case Book a conversation

Sievers Lackierungen, OberkochenPaint shop in its third generation

Painted once by the boss, started by anyone on the team

Running since 2023

The task
Plenty of orders, but hardly anyone applying for painting jobs.
Result
The know-how stays in the company, and painting continues when someone is absent. The team gave the robot a name. Today prospects visit the system: a job paint shop signed in 2026 after seeing it.
Built with
  • Self-learning Lesta MV A6 painting robot
  • Carousel with four part holders
  • Automatic spray gun with paint pressure regulator
  • Light curtains and push buttons on the safety fence

«Ich lackiere die Teile einmal mit dem Roboter, speichere das Programm, und danach kann jeder Mitarbeiter den Roboter bedienen und die Teile lackieren, ohne Lackierkenntnisse zu benötigen.»

Translation: “I paint the parts once with the robot and save the program. After that, any employee can operate the robot and paint the parts without needing any painting skills.”

David Sievers, head of Sievers Lackierungen Customer film Sievers Lackierungen Original quote in German

Full case Book a conversation

BETEC Beschichtungstechnik, near KarlsruhePowder coater

Six weeks later, the second robot was ordered

Running since 2023

The task
No qualified coaters, and an owner who said no twice.
Result
After six weeks the owner ordered the second robot. Today the staff hang up the parts and choose the program. At the maintenance visit in June 2026 both robots were in very good condition, and the company now hosts prospects from the Karlsruhe region itself.
Built with
  • Two Lesta MV A6 painting robots on a raised steel deck
  • The customer’s powder application equipment
  • Hooks and hangers for the conveyor
  • Two manual spray walls for touch-up

6 weeks until the second robot was ordered Source: Robonnement, BETEC Beschichtungstechnik project, 2023

«Ich habe Nein gesagt. Dann habe ich es ausprobiert. Jetzt kann ich mir nicht vorstellen, zurückzugehen.»

Translation: “I said no. Then I tried it. Now I can’t imagine going back.”

Kakhaber, head of BETEC Beschichtungstechnik Customer film BETEC Beschichtungstechnik Original quote in German

Full case Book a conversation

BORBET, wheel plant in ThuringiaAluminum wheels, foundry

A fully automatic die-coating system for the molds of wheel production

Running since July 2026

The task
The molds for casting wheels were heated to about 200 degrees and sprayed with die coating by hand: hot, heavy work.
Result
In operation since July 2026 and in production today. The system heats, checks and coats the molds fully automatically. We trained about 20 of the plant’s employees in two shifts.
Built with
  • Lesta MV A6 robot, heavy-duty version
  • Heavy-duty carousel with stations for scanning, heating and coating
  • 3D scanner for the position and shape of every mold
  • Ring burners heating to about 200 degrees

About 200 °C reached by every mold before the robot sprays the die coating Source: Robonnement project records, July 2026

Full case Book a conversation

Camouflage Automotive, HeilbronnPainting of carbon add-on parts

Expanded in three stages since 2023

Running since 2023

The task
Carbon parts in many variants, the highest demands on the surface, and every step must be documented.
Result
The robots paint the carbon parts in series. Camouflage hosts prospects during normal operation, most recently a plastics paint shop from Alsace in September 2026.
Built with
  • Lesta MV A6 painting robots, in three stages
  • Two turntables
  • 2K supply with explosion-proof consoles
  • Beckhoff terminals for proportional valves, Profinet

Since June 2026 also Inspection and measuring: Every part leaves the plant with an inspection report

Full case Book a conversation

A painting robot stands next to the fenced entrance of a coating booth.

Schneider Electric, plant in southern GermanyElectrical engineering, housing parts

A robot where the automatic guns cannot reach

Running since 2024

The task
The automatic guns could not reach the undercuts, so they were touched up by hand in every shift.
Result
In operation since 2024. The robot coats what the automatic guns cannot reach, and the plant wants to take it along into its next new booth.
Built with
  • Lesta MV A6 painting robot, ATEX version
  • Lifting axis in the existing line
  • The customer’s automatic powder guns
  • New extraction wall

Full case Book a conversation

Long longitudinal beams for truck bodies hang from a conveyor, freshly powder-coated in black.

Krone Group, coating plant in EmslandVehicle construction, truck bodies

A robot for the overhead work in the powder cloud

Ordered on September 2, 2026

The task
In three shifts, coaters stand under truck bodies and work overhead in the powder cloud.
Result
Ordered on September 2, 2026. Installation takes place between Christmas and New Year with three to four technicians, because the booth has to produce again from January 11, 2027.
Built with
  • Lesta MV A6 painting robot, ATEX version
  • Floor rail with up to 6 meters of travel
  • Rotary encoder on the chain drive
  • Two of the plant’s powder guns in a V arrangement

Full case Book a conversation

A cleaning robot stands on the wooden floor of a large staff restaurant between tables and chairs.

CERN, GenevaResearch, technical buildings and restaurant

After the summer, CERN asked for more floor space

Running since March 2026

The task
Large areas, cleaned at night and outside working hours, access with a badge only.
Result
In operation since March 2026. After the summer, CERN asked us to extend the robots’ working areas. Since September 2026, further floors are being added, one per day.
Built with
  • Two PUDU MT1 sweeping robots
  • Two PUDU CC1 wet cleaners
  • Dedicated maps, zones and night schedules
  • Monthly analysis per zone in Robonnement OS

Full case Book a conversation

A cleaning robot cleans the granite floor of a tall entrance hall with marble columns.

United Nations GenevaInternational organization, historic buildings

A marble problem became our mapping protocol

Running since December 2025

The task
Historic marble, guide lines for blind people and a sloping floor on which the robot got lost.
Result
After the remapping in February 2026, the customer was very satisfied with the marble cleaning. A new contract followed in September 2026: a new wet cleaner replaces the sweeper, and we are remapping the site with an additional hall.
Built with
  • PUDU CC1 wet cleaner
  • PUDU MT1 Vac sweeping and vacuum robot
  • Ceiling markers and laser map
  • White brushes for marble

Full case Book a conversation

A service robot with two waste bins and an information screen stands in an airport terminal hall.

Zurich AirportAirport, terminals

18 robots after a pilot in live operation

Ordered on August 19, 2026

The task
Collecting and sorting waste where passengers are on the move, with too few cleaning staff.
Result
Contract signed on August 19, 2026. Mapping starts in October, and commissioning is planned by the end of November 2026.
Built with
  • 15 PUDU BellaBot Pro as waste robots, with separate compartments
  • 3 PUDU BellaBot Pro as service robots
  • Fill-level sensors and the airport’s task system
  • Login through the airport’s system, PUDU Cloud

18 robots 15 for waste collection, 3 service robots Source: Robonnement, Zurich Airport project, contract of August 19, 2026

5 robots waste robots in the pilot, in live terminal operation Source: Robonnement, Zurich Airport pilot, from December 2025

«Wir haben einen zunehmenden Fachkräftemangel in der Reinigung mit häufig sehr fordernden Arbeitstagen.»

Translation: “We have a growing shortage of skilled cleaning staff, with often very demanding working days.”

Spokesperson, Zurich Airport watson (CH Media), December 12, 2025 (opens in a new window) Original quote in German

Full case Book a conversation

The film loads from YouTube only when you click (privacy-enhanced mode).

Without names

35 more projects, described by industry and location

With the same details as here: task, solution, result and status, numbers with source and date.

All use cases
A new painting robot on the turntable of a freshly fitted paint booth.

Painting Running since February 2026

Industrial paint shop in the Upper Palatinate

Before
Painters hard to find, booths running in shifts, no space to spare.
After
The robot paints in the existing booth, installed without stopping production.

4 weeks from pre-assembly in our workshop to the painted part, without stopping production

A cleaning robot cleans the floor of a large handball hall in the evening, the goals pushed to the side.

Cleaning Running since February 2026

Municipal sports hall in Basel

Before
Resin after every handball game, removed by hand at night before school sports begin.
After
The robot cleans at night, and the floor is done by 7:15 a.m.

About 1,900 m² cleaned by the robot per night, resin included

Chain conveyor with a curve under the timber roof of a production hall, the paint booth beside it.

Systems Being commissioned

Window manufacturer in the Upper Palatinate

Before
A robotic painting line that could no longer be maintained.
After
On September 20, 2026 the whole line ran fully automatically for the first time, fine-tuning continues.

14 of 14 commissioning days on schedule, station by station

At our reference customers

Real photos from our projects, with place and month.

  • A painting robot in a fenced cell by a conveyor line, with a control cabinet and boxes beside it.
    Maintenance day: axes and chains cleaned and greased BETEC Beschichtungstechnik near Karlsruhe,
  • A wide paint booth with a grating floor, the painting robot with coiled cables on the left.
    Connecting the robot in the paint booth Camouflage Automotive, Heilbronn,
  • A service robot with a screen stands in front of a fair-faced concrete wall in an airport terminal.
    Service robot at its spot in the terminal Zurich Airport,
  • A sweeping robot drives across the carpet of an office corridor, with a brochure rack on the left.
    The first sweeping robot makes its round in the corridor CERN, Geneva,
  • Close-up of an opened gearbox with bevel gears on a painting robot during maintenance.
    Maintenance: an opened gearbox on the robot arm Schneider Electric plant,

Contact

Tell us where things are stuck.

How we start

  • Free site walkthrough

    90 minutes, at your plant

    We look at your parts, booth, line or floors. You get an honest answer on whether a robot pays off for you, and if it does, a first concept.

  • Reference visit at a customer near you

    In live production

    See a robot at work and ask the people who run it every day.

More than 200 robots at more than 150 customers · Application technology for the paint industry since 2008

What is it about?
What would you like? (optional)

We will get back to you personally within two business days. +41 71 755 49 14 · [email protected]