Use case · Painting
Plastics paint shop for medical technology in the Black Forest-Baar district
One month after arrival, the plant produces with the robot
Before
At every spray wall, one person stood and sprayed all day.
After
The robot paints on a carousel, handed over on September 11, 2026, with room for a second robot.
In numbers
-
1 month
from the first day on site to handover
Source: Robonnement OS, August 10 to September 11, 2026
The situation
A mid-sized company: plastic parts for medical technology in batch sizes of 5 to 200. At each of the roughly four spray walls, a person stood spraying all day. The owner decided after visiting one of our systems.
What we built
A self-learning Lesta robot with a four-arm carousel and a turning unit. Plus a 2K supply with four independent circuits and two servo-driven gear dosing pumps, flushing, fencing and light curtains. We pre-built the application system in Altstätten to keep the time on site short. Together with the customer we moved the layout by 400 mm to leave room for a second robot.
Built with
- Self-learning Lesta MV A6 painting robot
- Four-arm carousel with turning unit
- 2K supply with four circuits and flushing
- Servo-driven gear dosing pumps
- Light curtains and two-hand confirmation
The result
First day on site on August 10, 2026, programming on September 3 and 4, training from September 8, handover on September 11, 2026. The customer’s goal for later: one person runs two cells.
Why it matters
From the first day on site to production in one month, with 2K and room for the second cell.
Pictures from the project
A similar task at your site?
On a free walkthrough at your plant (90 minutes) we tell you honestly whether a robot pays off for you. Or see a running system at a customer near you.
More than 200 robots at more than 150 customers · Application technology for the paint industry since 2008
Phone +41 71 755 49 14 Email [email protected]