Plastics finisher in Rhenish Hesse

Two robots on one axis: one flames, one paints

Running since January 2025 Anonymous case: we name the industry and the place, not the customer.

Before

Plastic parts were painted by hand, and every part must be flame-treated first.

After

Two robots on one axis, one flame-treats and one paints, since January 2025.

Painting robot in a protective cover on a linear axis along a long paint booth.

In numbers

  • 100 programs

    now fit into the program memory, instead of 30

    Source: Robonnement OS, September 2025

The situation

Plastic parts were painted by hand. For the paint to adhere, every part has to be flame-treated first. The company came to us on the recommendation of a company that already paints with our robots.

What we built

A painting robot and a second robot for flame treatment on a linear axis, connected to the existing 2K system via Profinet. When the flame came too close to the hand on the joystick during teaching, we fitted a heat shield. Programming is also done on screen with Paint Studio; we extended the program memory from 30 to 100 programs.

Built with

The result

Paint tests on January 20, 2025, training on January 21, and from January 27, 2025, the 2K system loads, paints and flushes together with the robot.

Why it matters

Two robots on one axis, connected to the system that was already there.

A similar task at your site?

On a free walkthrough at your plant (90 minutes) we tell you honestly whether a robot pays off for you. Or see a running system at a customer near you.

More than 200 robots at more than 150 customers · Application technology for the paint industry since 2008

Phone +41 71 755 49 14 Email [email protected]