Use case · Painting
Electric motor maker in Upper Swabia
Two robots run two booths
The situation
Electric motors are painted wet on wet. In every shift, one painter stood in the booth for the primer and one for the top coat.
What we built
Two self-learning Lesta robots run two booths, with a 2K paint supply and automatic part feeding. At the plant’s request, the robots’ signal lamps show the same as every other machine in the plant: green is working, orange is waiting. A small cleaning robot for the floors completes the setup.
Built with
- Two Lesta MV A6 painting robots
- 2K paint supply
- Automatic part feeding
- Signal lamps to the plant standard
- PUDU MT1 for the floors
The result
The system has been running for three years, and at the maintenance visit in September 2026 both robots were in good condition. The plant manager led the project himself.
Why it matters
Two robots, two booths, and the plant manager led the project himself.
A similar task at your site?
On a free walkthrough at your plant (90 minutes) we tell you honestly whether a robot pays off for you. Or see a running system at a customer near you.
More than 200 robots at more than 150 customers · Application technology for the paint industry since 2008
Phone +41 71 755 49 14 Email [email protected]