Skip to content

Use case · Painting

Composites manufacturer in Thurgau

Two systems, two different solutions

Running since 2023 Anonymous case: we name the industry and the place, not the customer.

Before

Parts up to 1.8 x 2 meters were primed by hand, at the first site without a conveyor.

After

Two systems prime with robots, one with a carousel and one on a rail along the booth.

A painting robot runs on a rail along the booth with its pressure tank, next to two large composite panels.

The situation

Fiber composite and plastic parts up to 1.8 x 2 meters were primed by hand. The first site had no conveyor.

What we built

System 1: a carousel robot, because there was no conveyor. System 2: a robot on a rail along the booth. Two hangers are pushed in side by side, the pressure tank travels with the robot, and we built the steel structure on the ceiling ourselves.

Built with

  • Two Lesta MV A6 painting robots
  • Carousel (system 1)
  • Rail along the booth with a pressure tank that travels along (system 2)
  • Ceiling steel structure of our own design

The result

A customer for more than two years, with two systems and two different solutions for priming.

Why it matters

We adapt the robot to the plant, not the other way round.

A similar task at your site?

On a free walkthrough at your plant (90 minutes) we tell you honestly whether a robot pays off for you. Or see a running system at a customer near you.

More than 200 robots at more than 150 customers · Application technology for the paint industry since 2008

Phone +41 71 755 49 14 Email [email protected]