Use case · Painting

Aerospace supplier in Westphalia

Four weeks from installation to series production

Running since April 2025 Anonymous case: we name the industry and the place, not the customer.

Before

More than 1,000 parts a month in a strict 2K process, all painted by hand.

After

Since April 2025 the robot has been painting the aerospace parts in series.

A partly covered painting robot with bundled cables stands in a new fenced cell.

In numbers

  • 4 weeks

    from the start of installation to full operation

    Source: Robonnement OS, April 1 to 29, 2025

The situation

A new project with more than 1,000 parts a month that must be painted very evenly. The 2K process is strict: scales, barcode, induction time, pot life and viscosity are all recorded. Until then everything was painted by hand.

What we built

A Lesta robot with a carousel and paint supply, a gun for round and flat spray patterns and a cup adapter like on the hand gun. Installation from April 1 to 3, 2025, consoles tested on April 14, first run on April 16, 2025.

Built with

The result

On April 29, 2025, the system was fully operational, four weeks after installation began. Since then the robot has been painting aerospace parts in series.

Why it matters

Aerospace demands repeatability, exactly the strength of a robot that learns from the best painter.

A similar task at your site?

On a free walkthrough at your plant (90 minutes) we tell you honestly whether a robot pays off for you. Or see a running system at a customer near you.

More than 200 robots at more than 150 customers · Application technology for the paint industry since 2008

Phone +41 71 755 49 14 Email [email protected]