Use case · Painting
Aerospace supplier in Westphalia
Four weeks from installation to series production
Before
More than 1,000 parts a month in a strict 2K process, all painted by hand.
After
Since April 2025 the robot has been painting the aerospace parts in series.
In numbers
-
4 weeks
from the start of installation to full operation
Source: Robonnement OS, April 1 to 29, 2025
The situation
A new project with more than 1,000 parts a month that must be painted very evenly. The 2K process is strict: scales, barcode, induction time, pot life and viscosity are all recorded. Until then everything was painted by hand.
What we built
A Lesta robot with a carousel and paint supply, a gun for round and flat spray patterns and a cup adapter like on the hand gun. Installation from April 1 to 3, 2025, consoles tested on April 14, first run on April 16, 2025.
Built with
- Lesta MV A6 painting robot with carousel
- 2K paint supply
- Gun for round and flat spray patterns
- Cup adapter like on the hand gun
The result
On April 29, 2025, the system was fully operational, four weeks after installation began. Since then the robot has been painting aerospace parts in series.
Why it matters
Aerospace demands repeatability, exactly the strength of a robot that learns from the best painter.
Pictures from the project
A similar task at your site?
On a free walkthrough at your plant (90 minutes) we tell you honestly whether a robot pays off for you. Or see a running system at a customer near you.
More than 200 robots at more than 150 customers · Application technology for the paint industry since 2008
Phone +41 71 755 49 14 Email [email protected]