Robots and painting systems for industry Robots take over the manual work you can no longer staff.

We build painting systems with Lesta robots: painting robots in existing booths and carousel cells, plus inspection cells and special machinery. For job coaters, paint shops and manufacturers, on subscription or to buy.

More than 200 robots at more than 150 customers · Application technology for the paint industry since 2008

Freshly powder-coated sheet-metal boxes hang from the conveyor of a powder line, with the coating booth behind.

Industry in numbers

  • 4 months

    to full capacity

    Source: Robonnement, Passt Coating AG project, commissioning 2022

  • 4 weeks

    from pre-assembly in our workshop to the painted part, without stopping production

    Source: Robonnement OS, January and February 2026

  • 1 month

    from the first day on site to handover

    Source: Robonnement OS, August 10 to September 11, 2026

  • More than 4,000 businesses

    supplied with application technology since 2008.

    Source: Robonnement order archive, 2008 to 2026

What we build

From a robot in your booth to a complete line.

We plan, build, commission and service afterwards. Most projects start in a booth that is already there.

  1. Painting robots in existing booths

    Powder and wet paint, with your guns and your paint supply. Your painter shows the movement once.

    Example: Passt Coating AG, Nunningen
  2. Cells with carousel and turntable

    Four arms, rotary unit, heavy duty up to 400 kg. One part is painted while the next is loaded.

    Example: Plastics paint shop for medical technology in the Black Forest-Baar district
  3. Robots on chain conveyors

    An encoder on the chain sprocket tells the robot how fast the parts are moving. The line stays as it is.

    Example: Family-run paint shop in the Hegau region
  4. Linear and lifting axes

    Up to 6 meters of travel for truck bodies and long profiles, lifting axes for undercuts on the line.

    Example: Krone Group, coating plant in Emsland
  5. Retrofitting existing lines

    New controls, scanners and operation for a line nobody could maintain anymore.

    Example: Window manufacturer in the Upper Palatinate
  6. Inspection and measuring cells

    A KUKA robot guides a 3D scanner or a deflectometry sensor over every part and files the result.

    Example: Camouflage Automotive, Heilbronn: inspection cell
  7. Special machinery

    An aerospace cell with a pit and an Ex zone, flame treatment and painting on one axis, rotary fixtures of our own design.

    Example: BORBET, wheel plant in Thuringia
  8. 2K mixing and dosing

    Our own low-pressure dosing with servo motors and gear pumps, dosed by volume instead of pressure.

    Example: Family-owned paint shop in Emsland
  9. Palletizing and handling

    Cells for the end of the line. We simulate gripper, cycle time and reach before anything is built.

    More: Systems and special machinery
  10. Application technology since 2008

    Spray guns, pumps, spare parts and overhauls for your manual booths and your robots.

    More: Application technology

From our projects

What changed for our customers: before and after.

We name only customers whose work with us is already public. All others we describe by industry and place.

12 cases

Freshly powder-coated sheet-metal boxes hang from the conveyor of a powder line, with the coating booth behind.

Painting Running since 2022

Passt Coating AG, Nunningen

Before
No powder coaters left to hire, orders piling up, the business close to shutting down.
After
The old line runs at full capacity again, and the plant is now our demo site in Switzerland.

4 months to full capacity

Systems Running since July 2026

BORBET, wheel plant in Thuringia

Before
The molds were heated to about 200 degrees and sprayed with die coating by hand.
After
The system heats, checks and coats the molds fully automatically, in production since July 2026.

About 200 °C reached by every mold before the robot sprays the die coating

A painting robot stands next to the fenced entrance of a coating booth.

Painting Running since 2024

Schneider Electric, plant in southern Germany

Before
The automatic guns could not reach the undercuts, so every shift recoated them by hand.
After
A robot at the line coats what the automatic guns cannot reach.
A painting robot in a protective cover stands in the middle of a four-station turntable, secured by light curtains.

Painting Running since 2023

Sievers Lackierungen, Oberkochen

Before
Hardly any applicants for painter jobs, and the know-how sat with a few experienced people.
After
Once a part has been painted with the robot, anyone on the team can start the program, even when someone is out.
A new painting robot on the turntable of a freshly fitted paint booth.

Painting Running since February 2026

Industrial paint shop in the Upper Palatinate

Before
Painters hard to find, booths running in shifts, no space to spare.
After
The robot paints in the existing booth, installed without stopping production.

4 weeks from pre-assembly in our workshop to the painted part, without stopping production

A painting robot with a spray gun in a cell screened with film, on a grating floor.

Painting Running since January 2025

Drive technology maker in Baden-Württemberg

Before
Gearboxes in many variants and complex shapes, painted entirely by hand.
After
A scanner checks every part and starts the right program, in production since January 2025.
Robot cell on a raised steel deck with stairs, the painting robot’s control cabinet in front.

Painting Running since 2023

BETEC Beschichtungstechnik, near Karlsruhe

Before
No qualified coaters, and an owner who said no twice.
After
Two robots coat, the team hangs the parts and picks the program.

6 weeks until the second robot was ordered

A painting robot in a protective cover stands between two racks of long steel profiles in a paint booth.

Painting Running since February 2026

Family-owned paint shop in Emsland

Before
Many colors in small containers, and the parts were moved by hand.
After
A robot with a carousel and 3D scanner applies powder and wet paint, since February 2026.

About 30 s for a color change with automatic gun and pressure tank

Coated metal parts hang in two rows from an overhead conveyor in a bright hall.

Painting Running since February 2025

Powder coater in the Upper Palatinate

Before
Parts up to four meters and 600 kg, many series and doubts about robots.
After
Since October 2025 the robot has coated some colors completely, on the moving chain.

530 km driven by the customer with his own part for the test coating

A new fenced robot cell with a turntable on the floor and a large exhaust duct overhead.

Painting Running since April 2025

Wet paint shop in Solingen

Before
Two booths, two shifts, many different parts and not enough staff.
After
Installed and handed over in one week in April 2025, a carousel robot has been painting ever since.

1 week for installation and handover

A painting robot powder-coats a large steel component on a turning unit in anthracite.

Painting Running since 2023

Job coater in Emsland

Before
Orders were growing, and the limit was not the equipment but the staff.
After
Two robots in two and three shifts, two more on order.

About 4 hours after a collision, the robot was back in production

All industrial use cases All 20 problems and cases

What we build with

Only technology we install ourselves.

These are the systems we build into booths, cells and lines today. Under each one: the projects it is part of.

We work with

  • Lesta
  • KUKA
  • SAMES Kremlin
  • Beckhoff
  • SICK
  • Leuze
  • Micro-Epsilon

When we advise against

Sometimes a robot is the wrong answer.

We say so before the offer, not after the order.

March 2026

A furniture maker wanted a painting robot.

About 500 m² of painted surface a day, 30 own colors, 20 to 30 color changes a day, parts almost four meters long. After the walkthrough we advised against it: the parts are too long for the booths, and the team paints the edges of stacked panels by hand simply and quickly. Most defects came earlier anyway, as dents in foil-coated panels that nobody sees before painting. We proposed a simple inspection station that measures every panel before and after painting.

About quality inspection How a project runs, step by step
  • March 2026

    An industrial paint shop tested a transport robot for its hall. Glossy parts disturbed the sensors. We did not keep using it there.

  • September 2026

    A maker of heavy drive parts asked for a low-cost cobot for the paint booth. We advised against it, because cobots need a lot of maintenance in paint mist and solvents, and proposed an industrial robot on a rail.

  • Every project

    The first question is: does it take one robot or a whole system? We ask it in the first conversation.

From current projects

Real photos from our projects, with place and month.

  • A painting robot with a powder gun stands in a fenced cell at a powder coating line.
    Commissioning a powder robot cell Powder coater in the Upper Palatinate,
  • Freshly painted panels on several mobile racks in a hall.
    Painted panels on the drying racks Industrial paint shop in the Upper Palatinate,
  • A painting robot with a black arm on a steel base frame in a workshop hall during pre-assembly.
    Pre-assembling the painting robot on its base frame For an industrial paint shop in the Upper Palatinate,
  • A painting robot stands in a booth right next to a chain conveyor that carries the parts past it.
    The robot is in place next to the chain conveyor Family-run paint shop in the Hegau region,
  • The arm of a ceiling-mounted painting robot reaches diagonally into a paint booth with a grating floor.
    Ceiling-mounted painting robot in the booth Agricultural machinery maker near Osnabrück,

What plant managers ask before their first robot

  • A painting robot in your existing booth costs from EUR 2,900 a month, including installation, maintenance and spare parts. Cells, inspection cells and special machines are priced after a free site walkthrough. We also tell you when it does not pay off.

  • No. Your painter teaches a painting robot by showing the motion, and with many variants a scanner recognizes the part and picks the program. Inspection cells and special machines are handed over with finished recipes, and we train your team to run them.

  • At an industrial painter in the Upper Palatinate, the first test program ran one week after arrival on site; with pre-assembly in Altstätten it was four weeks to the first painted part. At a plastics painter for medical technology it took one month from the first day on site to handover. Special machines take longer: we give you the schedule after the walkthrough.

  • No. We install during plant holidays or station by station. At a window maker in the Upper Palatinate, the retrofit of an entire painting line stayed on plan on 14 of 14 days.

  • We check remotely first, and a technician comes if needed. After a collision at a contract coater in Emsland, production was running again after about four hours. If a robot on the chain goes into alarm, the chain stops and your team can keep working by hand. What is binding is in your contract.

  • We do, from Altstätten: remote diagnosis first, then a technician on site. Maintenance and safety checks on schedule, one report per visit. At the contract coater in Emsland, for example, we replace the control cabinet coolers during regular service, about one hour per robot.

  • The robot does the repetitions, your people make the decisions. At an agricultural machinery maker the coater stays at the booth, at Sievers Lackierungen the team gave the robot a name, and at a paint shop in Saarland the painter now improves the programs himself. We train on site until your team runs the system on its own.

Reference · Passt Coating AG

Full capacity within four months

4 months to full capacity

All use cases

The next chapter

With Robonnement Intelligence

Your factory keeps the knowledge of its best people. People, robots and machines work as one system, and you ask your factory the way you would ask a person.

A dark, plain block with fine threads of light running into it from all sides. The hardware design is not yet final.

Contact

In 90 minutes, you will know whether a robot pays off for you.

How we start

  • Free site walkthrough

    90 minutes, at your plant

    We look at your parts, booth, line or floors. You get an honest answer on whether a robot pays off for you, and if it does, a first concept.

  • Reference visit at a customer near you

    In live production

    See a robot at work and ask the people who run it every day.

More than 200 robots at more than 150 customers · Application technology for the paint industry since 2008

What is it about?
What would you like? (optional)

We will get back to you personally within two business days. +41 71 755 49 14 · [email protected]